{"id":15525,"date":"2021-10-05T15:02:23","date_gmt":"2021-10-05T19:02:23","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=15525"},"modified":"2021-10-05T15:02:36","modified_gmt":"2021-10-05T19:02:36","slug":"portion-of-massachusetts-avenue-to-close-for-sewer-connection","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2021\/10\/05\/portion-of-massachusetts-avenue-to-close-for-sewer-connection\/","title":{"rendered":"PORTION OF MASSACHUSETTS AVENUE TO CLOSE FOR SEWER CONNECTION"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>WHO:<\/strong>&nbsp;Summit Consulting Building Contractors<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHAT:<\/strong>&nbsp;Road Closure<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHY:<\/strong>&nbsp;To make final sewer connection to the new building<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHEN:<\/strong>&nbsp;OCTOBER 11-18, 2021<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHERE:&nbsp;<\/strong>Massachusetts Avenue between Main Street and Cedar Street<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignright size-full\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"195\" height=\"228\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" src=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2021\/10\/Screenshot-1.png?resize=195%2C228&#038;ssl=1\" alt=\"\" class=\"wp-image-15526\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Construction continues on Summit Consulting\u2019s new eight-story, 135,000 square foot building, located at 117 N. Massachusetts Avenue, on Lake Mirror in downtown Lakeland. On Monday, October 11, general contractors will be closing Massachusetts Avenue between Main Street and Cedar Street, in order to make the final sewer connections to the new building, which will be completed in March of 2022 and occupied in April.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This extension will connect an existing manhole at the intersection of Massachusetts Avenue and Main Street to the building\u2019s connection point to the north. The existing sewer line that will serve this building runs north and south underneath Massachusetts Avenue and is located at a depth of eight feet.\u00a0This complicated project will require up to seven days to be fully completed.\u00a0 To accommodate the sewer work that needs to be completed, the portion of Massachusetts Avenue between Main Street and Cedar Street will be closed from Monday, October 11th\u00a0through Monday, October 18<sup>th<\/sup>. If this project is completed quicker than the anticipated timeline, Massachusetts Avenue will be opened accordingly.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WHO:&nbsp;Summit Consulting Building Contractors WHAT:&nbsp;Road Closure WHY:&nbsp;To make final sewer connection to the new building WHEN:&nbsp;OCTOBER 11-18, 2021 WHERE:&nbsp;Massachusetts Avenue between Main Street and Cedar Street Construction continues on Summit&hellip; <\/p>\n","protected":false},"author":2,"featured_media":15526,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[6],"tags":[1339],"class_list":["post-15525","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-community","tag-portion-of-massachusetts-avenue-to-close-for-sewer-connection"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/15525","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=15525"}],"version-history":[{"count":0,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/15525\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/15526"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=15525"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=15525"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=15525"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}