{"id":19334,"date":"2022-01-19T17:16:40","date_gmt":"2022-01-19T22:16:40","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=19334"},"modified":"2022-01-19T17:19:06","modified_gmt":"2022-01-19T22:19:06","slug":"portion-of-massachusetts-avenue-to-close-resurfacing-and-removal-of-construction-materials","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2022\/01\/19\/portion-of-massachusetts-avenue-to-close-resurfacing-and-removal-of-construction-materials\/","title":{"rendered":"PORTION OF MASSACHUSETTS AVENUE TO CLOSE RESURFACING AND REMOVAL OF CONSTRUCTION MATERIALS"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Construction is wrapping up on Summit Consulting\u2019s new eight story 135,000 square foot building located at 117 N. Massachusetts Avenue on Lake Mirror in downtown Lakeland. <\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" src=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2022\/01\/view-from-lake-mirror-1.png?resize=1024%2C576&#038;ssl=1\" alt=\"\" class=\"wp-image-19335\" srcset=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2022\/01\/view-from-lake-mirror-1.png?w=1024&amp;ssl=1 1024w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2022\/01\/view-from-lake-mirror-1.png?resize=300%2C169&amp;ssl=1 300w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2022\/01\/view-from-lake-mirror-1.png?resize=768%2C432&amp;ssl=1 768w\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Beginning Monday, January 31<sup>st<\/sup>\u00a0at 7 a.m. paving contractors will resurface Massachusetts Avenue between East Main Street and Cedar Street.\u00a0 <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Massachusetts Avenue will be resurfaced, striped, and painted with street markings on all four lanes.\u00a0 The work is estimated to take five days to complete with the road scheduled to be open at 5 p.m. on Friday, February 4<sup>th<\/sup>.\u00a0 <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once completed, the existing construction fencing, and concrete separators will be removed from the right-of-way. At that time, the impacted area of Massachusetts Avenue in front of the new Summit Consulting Building will not be hindered by construction materials and will be back to its original pre-construction design.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction is wrapping up on Summit Consulting\u2019s new eight story 135,000 square foot building located at 117 N. Massachusetts Avenue on Lake Mirror in downtown Lakeland. Beginning Monday, January 31st\u00a0at&hellip; <\/p>\n","protected":false},"author":1,"featured_media":19335,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[12,14],"tags":[2219],"class_list":["post-19334","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local","category-news","tag-portion-of-massachusetts-avenue-to-close"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/19334","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=19334"}],"version-history":[{"count":0,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/19334\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/19335"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=19334"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=19334"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=19334"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}