{"id":21366,"date":"2022-04-01T18:07:15","date_gmt":"2022-04-01T22:07:15","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=21366"},"modified":"2022-04-01T18:07:22","modified_gmt":"2022-04-01T22:07:22","slug":"mosaic-investigating-possible-tear-in-the-lining-of-gypsum-stack-repairs","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2022\/04\/01\/mosaic-investigating-possible-tear-in-the-lining-of-gypsum-stack-repairs\/","title":{"rendered":"Mosaic investigating possible tear in the lining of gypsum stack repairs"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">An investigation is examining potential issues with the repairs to the massive sinkhole that opened at the gypsum stack at Mosaic&#8217;s New Wales phosphate mining facility in August 2016.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Officials are investigating a potential tear in its lining at the gypsum stack at the facility.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" src=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2022\/04\/0604_mosaic_fix_jpg_04012022.jpg?resize=1024%2C576&#038;ssl=1\" alt=\"\" class=\"wp-image-21367\" srcset=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2022\/04\/0604_mosaic_fix_jpg_04012022.jpg?w=1024&amp;ssl=1 1024w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2022\/04\/0604_mosaic_fix_jpg_04012022.jpg?resize=300%2C169&amp;ssl=1 300w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2022\/04\/0604_mosaic_fix_jpg_04012022.jpg?resize=768%2C432&amp;ssl=1 768w\" \/><figcaption>Mosaic said that in 2018 it had completed the huge task of repairing the massive sinkhole in Mulberry.<br><\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Mosaic was alerted to the possible tear by a warning system. It detected a change in water pressure within the gypsum stack.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Florida Department of Environmental Protection has been notified.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In 2016, a sinkhole 45 feet wide and 220 feet deep was discovered beneath the stack.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Two years later, after thousands of work repair hours and $84 million in costs,&nbsp;<a href=\"https:\/\/www.baynews9.com\/fl\/tampa\/news\/2018\/06\/04\/mosaic--massive-sinkhole-repairs-complete\">Mosaic announced the sinkhole was repaired<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An investigation is examining potential issues with the repairs to the massive sinkhole that opened at the gypsum stack at Mosaic&#8217;s New Wales phosphate mining facility in August 2016.&nbsp; Officials&hellip; <\/p>\n","protected":false},"author":1,"featured_media":21367,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[14],"tags":[2639],"class_list":["post-21366","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-mosaic-investigating-possible-tear-in-the-lining-of-gypsum-stack-repairs"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/21366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=21366"}],"version-history":[{"count":0,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/21366\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/21367"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=21366"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=21366"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=21366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}