{"id":28592,"date":"2023-01-05T13:58:09","date_gmt":"2023-01-05T18:58:09","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=28592"},"modified":"2023-01-05T13:58:13","modified_gmt":"2023-01-05T18:58:13","slug":"total-wrecking-environmental-to-demolish-260-stack-90-boiler-at-lakeland-electric-power-plant-on-jan-14","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2023\/01\/05\/total-wrecking-environmental-to-demolish-260-stack-90-boiler-at-lakeland-electric-power-plant-on-jan-14\/","title":{"rendered":"<strong>TOTAL WRECKING &amp; ENVIRONMENTAL TO DEMOLISH 260\u2019 STACK &amp; 90\u2019 BOILER AT LAKELAND ELECTRIC POWER PLANT ON JAN. 14<\/strong>"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Total Wrecking &amp; Environmental, one of the country\u2019s leading industrial demolition contractors based in Buffalo New York, has been working at the Lakeland Electric C.D. McIntosh Power Plant in Florida for the last 6 months.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Over the next year, Total Wrecking &amp; Environmental will complete the abatement, remediation, demolition, asset recovery, and removal of 3 massive coal-fired units that have been in operation for over 40 years.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" src=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2023\/01\/unnamed-5.jpg?resize=1024%2C768&#038;ssl=1\" alt=\"\" class=\"wp-image-28593\" srcset=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2023\/01\/unnamed-5.jpg?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2023\/01\/unnamed-5.jpg?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2023\/01\/unnamed-5.jpg?resize=768%2C576&amp;ssl=1 768w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2023\/01\/unnamed-5.jpg?w=1120&amp;ssl=1 1120w\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">On January 14th, 2023 in Lakeland, will gather to witness the first implosion phase of the Lakeland power plant project by felling the 260-foot stack and 90-foot Selective Catalytic Reduction (SCR) unit. This project is unprecedented in both scope and complexity, requiring a tremendous amount of resources, specialized crew members, and surgical planning to ensure the demolition is performed safely and on-time, as this project is being performed in an active working power facility.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&nbsp;\u201cTotal Wrecking &amp; Environmental is thrilled to clear and restore a critical area within the Lakeland McIntosh Power Plant for a newer energy facility,\u201d says Frank Bodami, Founder &amp; CEO of Total Wrecking &amp; Environmental LLC. \u201cWe\u2019re excited to apply our unparalleled demolition expertise and clear the way for Lakeland Electric\u2019s new gas-fired reciprocating internal combustion engine (RICE) power plant.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Total Wrecking &amp; Environmental is also working hand-in-hand with the Wounded Warrior Project to provide \u201cfront row\u201d live streaming access for the entire implosion event. How often do you get to see a live power plant implosion? Make a donation on the campaign page and receive an exclusive live streaming link for supporting this amazing cause.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/d10fpl04.na1.hubspotlinksfree.com\/Ctc\/ZU+113\/d10FpL04\/VXbHW96_3QkgW9gm0mW3VK085W5VG-2S4Vq_fpN6hnpnk5knJ3V3Zsc37CgRNQW3h-gTB7_LqgSW4gdyLJ6GXgNzVhBzKG8QFWrpW3LC_wx6_gPf3W965S7n2x18KVW6pkzQ55S29gHW3KMxZ-8bDgwhW4JffHk8GJrdVW6qd5ZW1Vgmd2VZqmpd2Ptp0hW7W75PK9kpXYhW3c4pg441x-9gW2G9fLx2ngXslW8mNjZT7chF43W5FNwLY3W4Q1HW6Dkf5c597Z95W6d8pVh6Ss5ZsW8lc-6s5wF6MfN2Sn4J0cPfKNV5jbBf2F2GxGW5JH8FP6RQTJSVsQXbM8b_XjxW1q3rcx7w_4qtW3_NG0Q2rP4vTW9h5wcW2TygTYW2lZ5pj1pCgv5W4xqCSL7qm5JNW6YsrJb6RVFbsW4VRXLz1Qcd6zVC6gX_15ZcwCW5_-kl32NmmZpW6ywQVL6jBJYB35bW1\" target=\"_blank\" rel=\"noreferrer noopener\">Find out more by reading here<\/a>.&nbsp; In March 2023, Frank Bodami will travel back to Lakeland, Florida to direct Total Wrecking &amp; Environmental LLC\u2019s second controlled implosion of the coal-fired hung boiler units that represented the nucleus of the station at the McIntosh Power Plant for Lakeland Electric.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Total Wrecking &amp; Environmental, one of the country\u2019s leading industrial demolition contractors based in Buffalo New York, has been working at the Lakeland Electric C.D. McIntosh Power Plant in Florida&hellip; <\/p>\n","protected":false},"author":1,"featured_media":28593,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[12,14],"tags":[4196],"class_list":["post-28592","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local","category-news","tag-total-wrecking-environmental-to-demolish-260-stack-90-boiler"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/28592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=28592"}],"version-history":[{"count":0,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/28592\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/28593"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=28592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=28592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=28592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}