{"id":35357,"date":"2023-08-30T13:45:19","date_gmt":"2023-08-30T17:45:19","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=35357"},"modified":"2023-08-30T13:45:24","modified_gmt":"2023-08-30T17:45:24","slug":"portion-of-east-orange-street-and-south-lake-avenue-to-close-for-approximately-three-months","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2023\/08\/30\/portion-of-east-orange-street-and-south-lake-avenue-to-close-for-approximately-three-months\/","title":{"rendered":"PORTION OF EAST ORANGE STREET AND SOUTH LAKE AVENUE TO CLOSE FOR APPROXIMATELY THREE MONTHS"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>WHAT:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/strong>Street Closures<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHERE:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/strong>East Orange Street and South Lake Avenue<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHEN:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/strong>September 11 \u2013 December 15<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHY:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<\/strong>Infrastructure for newly built apartments<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHO:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/strong>Tiger Contracting LLC \u2013 Orange Street Apartments<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"567\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" src=\"https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2023\/08\/ORANGE-ST-DETOUR-1024x567.png\" alt=\"\" class=\"wp-image-35358\" srcset=\"https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2023\/08\/ORANGE-ST-DETOUR-1024x567.png 1024w, https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2023\/08\/ORANGE-ST-DETOUR-300x166.png 300w, https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2023\/08\/ORANGE-ST-DETOUR-768x426.png 768w, https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2023\/08\/ORANGE-ST-DETOUR.png 1422w\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Starting September 11, 2023, a portion of East Orange Street from Iowa Avenue to South Lake Avenue will be closed along with a portion of South Lake Avenue from East Orange Street to East Lime Street for approximately three months.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is anticipated that the road closures will remain in effect through December 15, 2023. Dedicated crews will be doing the necessary work connecting City utilities and installing critical infrastructure for the project currently known as the Orange Street Apartments.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To ensure the smooth flow of traffic and the safety of all residents and workers, the appropriate measures and detours will be in place as part of a traffic management plan for the duration of the project. Message boards are currently in place to notify motorist and residents about the upcoming road closures.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The developers of the Orange Street Apartments are covering the costs and construction of the project. Most of the work will be performed by Tiger Contracting LLC who is overseeing the project. They will be working with City of Lakeland Water and Wastewater crews to make the proper water and sewer infrastructure connections.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WHAT:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Street Closures WHERE:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;East Orange Street and South Lake Avenue WHEN:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;September 11 \u2013 December 15 WHY:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Infrastructure for newly built apartments WHO:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Tiger Contracting LLC \u2013 Orange Street Apartments Starting September 11, 2023,&hellip; <\/p>\n","protected":false},"author":2,"featured_media":35358,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"{title}\n\n{excerpt}\n\n{url}","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[12,14],"tags":[5870],"class_list":["post-35357","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local","category-news","tag-portion-of-east-orange-street-and-south-lake-avenue-to-close-for-approximately-three-months"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/35357","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=35357"}],"version-history":[{"count":1,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/35357\/revisions"}],"predecessor-version":[{"id":35359,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/35357\/revisions\/35359"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/35358"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=35357"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=35357"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=35357"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}