{"id":40686,"date":"2024-01-05T12:02:59","date_gmt":"2024-01-05T17:02:59","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=40686"},"modified":"2024-01-05T12:03:06","modified_gmt":"2024-01-05T17:03:06","slug":"south-boulevard-success-avenue-and-e-park-street-resurfacing-project","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2024\/01\/05\/south-boulevard-success-avenue-and-e-park-street-resurfacing-project\/","title":{"rendered":"SOUTH BOULEVARD, SUCCESS AVENUE, AND E. PARK STREET\u00a0RESURFACING PROJECT"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>WHO:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractors working for the City of Lakeland<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHAT:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Milling and paving project<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHY:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Roadway resurfacing part of preventative maintenance schedule<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHEN:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Milling will start Monday, January 15, and resurfacing January 22, 2024<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHERE:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; South Boulevard, Success Avenue and East Park Street.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"674\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" src=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2024\/01\/repaving.jpg?resize=1024%2C674&#038;ssl=1\" alt=\"\" class=\"wp-image-40687\" style=\"width:460px;height:auto\" srcset=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2024\/01\/repaving.jpg?resize=1024%2C674&amp;ssl=1 1024w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2024\/01\/repaving.jpg?resize=300%2C197&amp;ssl=1 300w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2024\/01\/repaving.jpg?resize=768%2C506&amp;ssl=1 768w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2024\/01\/repaving.jpg?w=1191&amp;ssl=1 1191w\" \/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">The City of Lakeland will start the paving process on South Boulevard, Success Avenue and East Park Street starting January 15, 2024.\u00a0 Contractors working for the City of Lakeland will start milling the asphalt surface down to the road base and then systematically move to the next street until all three are milled.\u00a0 Milling is expected to take at least three days.\u00a0\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">New asphalt will start to be installed on Monday, January 22, 2024.&nbsp; Resurfacing after milling is expected to take three days. The roadway must be milled before paving otherwise the elevation of the road would continue to get higher every time a paving project occurred.&nbsp; Milling before paving prevents driveway and ADA ramp adjustments due to increasing pavement heights. It is common practice to mill down the road before adding a hot paving mix.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This project will be performed during the daytime hours to least impact the residential area. Vehicular traffic will be limited while the contractor is working.&nbsp;During this project, traffic control signs will be in place and flagmen will be there to assists motorists. Delays are to be expected and motorist are encouraged to use an alternative route if possible.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WHO:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractors working for the City of Lakeland WHAT:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Milling and paving project WHY:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Roadway resurfacing part of preventative maintenance schedule WHEN:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Milling will start Monday, January 15, and resurfacing&hellip; <\/p>\n","protected":false},"author":2,"featured_media":40687,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"12","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[12,14],"tags":[7191,7190,7189],"class_list":["post-40686","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local","category-news","tag-and-e-park-street-resurfacing-project","tag-south-boulevard","tag-success-avenue"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/40686","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=40686"}],"version-history":[{"count":0,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/40686\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/40687"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=40686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=40686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=40686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}