{"id":41467,"date":"2024-01-29T14:17:26","date_gmt":"2024-01-29T19:17:26","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=41467"},"modified":"2024-01-29T14:17:31","modified_gmt":"2024-01-29T19:17:31","slug":"portion-of-the-trail-between-dog-leg-woods-dog-park-and-lakeland-family-ymca","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2024\/01\/29\/portion-of-the-trail-between-dog-leg-woods-dog-park-and-lakeland-family-ymca\/","title":{"rendered":"PORTION OF THE TRAIL BETWEEN DOG LEG WOODS DOG PARK AND LAKELAND FAMILY YMCA"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Who:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; City of Lakeland Public Works &#8211; Construction &amp; Maintenance Division&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What:<\/strong>&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Three Parks Trail West Construction<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Why:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Complete the Three Parks Trail Multi-use Path System&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>When:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Project starts January 29, 2024<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Where:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Three Parks Trail from Cleveland Heights Boulevard to Westover Street&nbsp;<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"275\" height=\"183\" sizes=\"auto, (max-width: 275px) 100vw, 275px\" src=\"https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2024\/01\/DOG-LEG-WOODS-DOG-PARK.jpeg\" alt=\"\" class=\"wp-image-41468\"\/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">The Three Parks Trail West project will complete the loop of the City of Lakeland\u2019s Three Park Trail by constructing the last segment of the trail that is currently sidewalk.\u00a0 The construction will include approximately 0.6 miles of a 10-foot-wide concrete multi-use trail along the north side of Westover Street and along the east side of Cleveland Heights Boulevard.\u00a0 The work includes clearing, removing existing concrete, earthwork, curb construction, sidewalk, driveway reconstruction and pavement marking.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Three Parks Trail is a 3.6-mile multi-use path that connects Peterson Park, Woodlake Park and Publix Charities Park.&nbsp; Three Parks Trail System began construction in 2015. &nbsp;This last phase of the project will extend the existing asphalt trail that runs along the perimeter of Cleveland Heights Golf Course south to Lakeland Family YMCA, then east to Peterson Park.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"275\" height=\"183\" sizes=\"auto, (max-width: 275px) 100vw, 275px\" src=\"https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2024\/01\/download-1-4.jpeg\" alt=\"\" class=\"wp-image-41469\" style=\"width:419px;height:auto\"\/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Three Parks Trail is a component of the City\u2019s Lake-to-Lake Bikeway.&nbsp; In addition, this segment is part of a designated proposed pathways corridor in the City of Lakeland\u2019s Pathways Vision Plan included in the transportation section of the City\u2019s Comprehensive Plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">City of Lakeland crews will begin preliminary construction on January 29, 2024, prepping the area for construction that will soon start. The outside north bound lane will be closed to traffic during construction.&nbsp; This project should not impact south bound travel. &nbsp;Motorists and pedestrians can expect delays and should use alternate routes when available. &nbsp;This project is expected to take approximately seven months to complete.&nbsp;Funding for the project was provided by the Florida Department of Transportation in the amount of $348,000.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Who:&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; City of Lakeland Public Works &#8211; Construction &amp; Maintenance Division&nbsp; What:&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Three Parks Trail West Construction Why:&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Complete the Three Parks Trail Multi-use Path System&nbsp; When:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&hellip; <\/p>\n","protected":false},"author":2,"featured_media":41469,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"{title}\n\n{excerpt}\n\n{url}","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[6],"tags":[7413],"class_list":["post-41467","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-community","tag-portion-of-the-trail-between-dog-leg-woods-dog-park-and-lakeland-family-ymca"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/41467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=41467"}],"version-history":[{"count":0,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/41467\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/41469"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=41467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=41467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=41467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}