{"id":41735,"date":"2024-02-06T15:04:01","date_gmt":"2024-02-06T20:04:01","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=41735"},"modified":"2024-02-06T15:04:12","modified_gmt":"2024-02-06T20:04:12","slug":"south-boulevard-success-avenue-e-park-street-and-carolina-avenue-resurfacing-project","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2024\/02\/06\/south-boulevard-success-avenue-e-park-street-and-carolina-avenue-resurfacing-project\/","title":{"rendered":"SOUTH BOULEVARD, SUCCESS AVENUE,\u00a0E. PARK STREET,\u00a0AND CAROLINA AVENUE RESURFACING PROJECT"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>WHO:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractors working for the City of Lakeland<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHAT:<\/strong>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Milling and paving project<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHY:<\/strong>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Roadway resurfacing is part of the preventative maintenance schedule<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHEN:<\/strong>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Milling will start Monday, March 11, and resurfacing on March 18, 2024<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>WHERE:<\/strong>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 South Boulevard, Success Avenue,\u00a0East Park Street,\u00a0and Carolina Avenue<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"277\" height=\"182\" sizes=\"auto, (max-width: 277px) 100vw, 277px\" src=\"https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2024\/02\/download-1.jpeg\" alt=\"\" class=\"wp-image-41736\" style=\"width:428px;height:auto\"\/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">The City of Lakeland will start the paving process on South Boulevard, Success Avenue,\u00a0East Park Street\u00a0and the portion of Carolina Avenue between Kerneywood Street and Beacon Road\u00a0starting March 11, 2024.\u00a0 Contractors working for the City of Lakeland will start milling the asphalt surface down 1.5 inches and then systematically move to the next street until all\u00a0four\u00a0are milled.\u00a0 Milling is expected to take at least three days.\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">New asphalt will start to be installed on Monday, March 18, 2024.&nbsp; Resurfacing after milling is expected to take three days. The roadway must be milled before paving otherwise the elevation of the road would continue to get higher every time a paving project occurred.&nbsp; Milling before paving prevents driveway and ADA ramp adjustments due to increasing pavement heights. It is common practice to mill down the road before adding a hot paving mix.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This project will be performed during the daytime hours to least impact the residential area. Vehicular traffic will be limited while the contractor is working. During these projects, traffic control signs will be in place and flagmen will be there to assists motorists. Delays are to be expected and motorist are encouraged to use an alternative route if possible.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>WHO:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Contractors working for the City of Lakeland WHAT:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Milling and paving project WHY:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Roadway resurfacing is part of the preventative maintenance schedule WHEN:\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Milling will start Monday, March 11,&hellip; <\/p>\n","protected":false},"author":2,"featured_media":41736,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"{title}\n\n{excerpt}\n\n{url}","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[12,14],"tags":[7476,7475,7190,7189],"class_list":["post-41735","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local","category-news","tag-and-carolina-avenue-resurfacing-project","tag-e-park-street","tag-south-boulevard","tag-success-avenue"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/41735","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=41735"}],"version-history":[{"count":0,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/41735\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/41736"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=41735"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=41735"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=41735"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}