{"id":638,"date":"2019-07-03T20:00:45","date_gmt":"2019-07-03T20:00:45","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=638"},"modified":"2019-07-03T20:00:58","modified_gmt":"2019-07-03T20:00:58","slug":"lakeland-electric-gets-major-pushback-on-shuttering-le-unit-3","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2019\/07\/03\/lakeland-electric-gets-major-pushback-on-shuttering-le-unit-3\/","title":{"rendered":"Lakeland Electric gets major pushback on shuttering LE Unit 3"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"403\" sizes=\"auto, (max-width: 1110px) 100vw, 1110px\" src=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2019\/07\/LE-McIntosh-Plant.jpg?resize=600%2C403&#038;ssl=1\" alt=\"\" class=\"wp-image-639\" srcset=\"https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2019\/07\/LE-McIntosh-Plant.jpg?w=600&amp;ssl=1 600w, https:\/\/i0.wp.com\/lakelandgazette.info\/news\/wp-content\/uploads\/2019\/07\/LE-McIntosh-Plant.jpg?resize=300%2C202&amp;ssl=1 300w\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">As Lakeland Electric officials presented the estimated costs\nof replacing its coal-fired plant, the utility was pressed to keep McIntosh\nUnit 3 running a little longer.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ron Kremann, LE&#8217;s special projects manager, said it would\ncost the city roughly $3.43 billion to replace its 37-year-old Unit 3, which&nbsp;it\nplans to shut down by fall 2024, with another coal-powered plant. He suggested\nthe municipal-owned utility may wish to switch up its fuel source.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Currently, the ideal is probably natural gas,&#8221; he\nsaid. &#8220;Will things change? They certainly could.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Kremann cited 2018 numbers from the U.S. Energy Information\nAdministration indicating three different types of generators would cost a\nfraction of a new coal plant, each costing $600 million or less to construct. He\nalso presented figures which indicate that natural gas-powered units are\ncheaper to operate and maintain. Lakeland Electric officials stated in May its\nnatural gas-fired Unit 5 is $20 an hour cheaper to operate than Unit 3.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;The national trend is there&#8217;s only one coal plant\nunder construction,&#8221; he said, noting it&#8217;s by the University of Alaska in\nFairbanks. &#8220;They said the only reason they went with coal is the site has\nno gas pipeline, no oil pipeline, limited wind and is dark most of the year.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">National energy production from coal-fired units is expected\nto drop 35% by 2025, according to Kremann, in large part fueled by the\nincreasing environmental regulations. Nearly $900 million of the $3.4 billion\nfor a new coal plant would simply be for federally-mandated technology to\ncapture and store carbon dioxide emissions. The second part is carbon taxes\nbeing leveraged on coal use.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Faced with national trends and increasing costs, members of\nthe city&#8217;s utility commission were not convinced that decommissioning Unit 3 is\nthe right direction for Lakeland&#8217;s future.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;I&#8217;m not a fan of shutting down our coal plant,\nespecially not by 2024. I think it&#8217;s an arbitrary timeline,&#8221; Commissioner\nJustin Troller said. &#8220;I think we are setting ourselves up for failure and\nleaving ourselves no choice in 2024.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Troller expressed concerns that heavy reliance on a single\nfuel source, such as natural gas, could increase costs to Lakeland Electric&#8217;s\ncustomers. He said residents could be more strongly impacted by market\nfluctuations or further regulations of fracking, a process of releasing natural\ngas. He asked if the utility had performed any formal study of Unit 3&#8217;s\nlifecycle.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mike Beckham, LE&#8217;s assistant general manager of production,\nsaid no formal calculations had been run, but had been discussed at length.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;It&#8217;s getting exorbitantly expensive to keep replacing\nthings,&#8221; he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lakeland Electric was forced to take Unit 3 offline for an\nextended period from late January into May for $1.4 million in emergency\nrepairs. Once running again, the utility company discovered&nbsp;a misalignment\nin Unit 3&#8217;s water feed pump, according to Beckham, limiting energy production\nto 200 megawatts a day in June.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The vibrations caused by the misalignment remain an ongoing\nissue plaguing Lakeland Electric. Beckham said while the coal plant is running\nagain, it remains limited to two-thirds of its 360-megawatt capacity. The\ncompany is now bringing in a consultant to evaluate and help determine the\nsource of the issues, according to Beckham. He expressed hope Unit 3 will be\noperational within a few days to The Ledger, but made no guarantee.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;Everyone is walking away from coal plants with nothing\nto replace them. That&#8217;s the bottom line,&#8221; Daryl Johnson, a utility\ncommittee member, said. &#8220;The question remains, in the long term, what do\nwe do from that standpoint. You&#8217;ve painted a pretty bleak picture for building\na coal plant.&#8221;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Kremann said he strongly believes the utility&#8217;s future lies\nin a mix of renewable sources with something else to generate the 144 megawatts\nneeded to meet energy demands. Lakeland Electric officials, including General\nManager Joel Ivy,&nbsp;have indicated since April that solar energy is an\noption&nbsp;to keep a diversity of energy sources.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;It&#8217;s still very expensive right now,&#8221; Kremann\nsaid, indicating there may be grants available.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">He also indicated he&#8217;s had conversations with a\nFlorida-based supplier of liquid nitrogen to see if the compacted fuel could be\nanother option for the city. Commissioner Stephanie Madden&#8217;s idea of looking at\nnew trends in nuclear technology gained some support, though more research is\nneeded.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Johnson suggested the utility should consider another joint\nventure with Orlando Utilities Commission, which owns 40% of Unit 3.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;They are definitely a good candidate for that,&#8221;\nKremann said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lakeland Electric has already engaged in unofficial\nconversations with OUC about future power supply and generation. The\nOrlando-based utility reported breaking its all-time peak power demand record\nin June.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;It would be difficult for us to build a big plant\nwithout a partner,&#8221; Kremann said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Members of the city&#8217;s utility committee seemed to agree they\nwant Lakeland to continue to be an energy producer, rather than relying on\nenergy purchased from other utility companies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;We have a history of generating our own power, we need\nto find funds and creative ways to see if we can continue to do that,&#8221;\nJohnson said. &#8220;It puts us in a stronger position 30, 40, 50 years down the\nroad.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As Lakeland Electric officials presented the estimated costs of replacing its coal-fired plant, the utility was pressed to keep McIntosh Unit 3 running a little longer. Ron Kremann, LE&#8217;s special&hellip; <\/p>\n","protected":false},"author":1,"featured_media":639,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"0","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":false},"version":2},"_wpas_customize_per_network":false},"categories":[14],"tags":[],"class_list":["post-638","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/638","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=638"}],"version-history":[{"count":0,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/638\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/639"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=638"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=638"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=638"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}