{"id":85187,"date":"2026-10-16T21:41:20","date_gmt":"2026-10-17T01:41:20","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=85187"},"modified":"2026-10-16T21:41:29","modified_gmt":"2026-10-17T01:41:29","slug":"why-south-florida-avenues-road-diet-rebuild-will-take-years-longer-than-expected","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2026\/10\/16\/why-south-florida-avenues-road-diet-rebuild-will-take-years-longer-than-expected\/","title":{"rendered":"Why South Florida Avenue&#8217;s Road Diet Rebuild Will Take Years Longer Than Expected"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img data-dominant-color=\"6c6967\" data-has-transparency=\"false\" style=\"--dominant-color: #6c6967;\" loading=\"lazy\" decoding=\"async\" width=\"738\" height=\"414\" sizes=\"auto, (max-width: 738px) 100vw, 738px\" src=\"https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2026\/10\/images-1-9.webp\" alt=\"\" class=\"wp-image-85188 not-transparent\" srcset=\"https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2026\/10\/images-1-9.webp 738w, https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2026\/10\/images-1-9-300x168.webp 300w\" \/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">The permanent rebuild of the <strong>South Florida Avenue (SR 37) road diet<\/strong> corridor between Ariana Street and Lime Street in Dixieland has faced significant timeline extensions and construction complexities:<sup><\/sup><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\ud83d\udcc5 Estimated Timeline &amp; Key Milestones<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Design Phase:<\/strong> Expected to hit 100% completion by <strong>December 2026<\/strong>.<\/li>\n\n\n\n<li><strong>Bidding &amp; Final Approval:<\/strong> Slated for <strong>February 2027<\/strong>.<\/li>\n\n\n\n<li><strong>Construction Start:<\/strong> Scheduled to break ground in <strong>Spring 2027<\/strong>.<\/li>\n\n\n\n<li><strong>Construction Duration:<\/strong> Buildout is anticipated to take <strong>2 to 3+ years<\/strong>, meaning physical work and lane restrictions will likely extend into <strong>2029 or 2030<\/strong>.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">\ud83d\udea7 Why the Construction Will Take So Long<\/h2>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li><strong>Phased &#8220;One Lane at a Time&#8221; Construction:<\/strong> Because South Florida Avenue is a high-volume north-south arterial corridor, crews cannot shut the roadway down entirely. Traffic engineering plans require work to be completed incrementally\u2014one lane at a time\u2014similar to the approach used on Lakeland Hills Boulevard.<\/li>\n\n\n\n<li><strong>Complex Utility &amp; Right-of-Way Relocation:<\/strong> Beyond paving, the $22 million project involves extensive underground utility reconstruction, storm drainage updates, right-of-way acquisition, and sidewalk adjustments along historical commercial frontages.<\/li>\n\n\n\n<li><strong>Traffic Restrictions &amp; Signalization:<\/strong> During construction, left turns will be limited in designated sectors to prevent gridlock, slowing down the overall pace of heavy equipment movement and concrete pouring.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">\ud83d\udca1 What the Final Plan Includes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When completed, the temporary concrete barriers will be removed and replaced with a permanent standard layout:<sup><\/sup><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Three 11-foot travel lanes<\/strong> (one lane northbound, one lane southbound, plus a center turn lane).<\/li>\n\n\n\n<li><strong>Expanded multi-use sidewalks<\/strong> for pedestrians and cyclists.<\/li>\n\n\n\n<li><strong>Mid-block signalized pedestrian crossings<\/strong> (including one near Born &amp; Bread Bakehouse between Belmar and Park Streets).<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The permanent rebuild of the South Florida Avenue (SR 37) road diet corridor between Ariana Street and Lime Street in Dixieland has faced significant timeline extensions and construction complexities: \ud83d\udcc5&hellip; <\/p>\n","protected":false},"author":2,"featured_media":85188,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"","inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"{title}\n\n{excerpt}\n\n{url}","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":true,"token":"eyJpbWciOiJodHRwczpcL1wvbGFrZWxhbmRnYXpldHRlLmluZm9cL25ld3NcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjZcLzEwXC9pbWFnZXMtMS05LndlYnAiLCJ0eHQiOiJXaHkgU291dGggRmxvcmlkYSBBdmVudWUmIzgyMTc7cyBSb2FkIERpZXQgUmVidWlsZCBXaWxsIFRha2UgWWVhcnMgTG9uZ2VyIFRoYW4gRXhwZWN0ZWQiLCJ0ZW1wbGF0ZSI6ImRvaXMiLCJmb250IjoiIiwiYmxvZ19pZCI6MTYzMDQwNjYxfQ.n1RpDtAxdt2abn-hk3DpFcQBb7pOSW3egv0malKNrPEMQ"},"version":2,"media_source":"sig","attached_media":[{"id":0,"url":"https:\/\/jetpack.com\/redirect\/?source=sigenerate&query=t%3DeyJpbWciOiJodHRwczpcL1wvbGFrZWxhbmRnYXpldHRlLmluZm9cL25ld3NcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjZcLzEwXC9pbWFnZXMtMS05LndlYnAiLCJ0eHQiOiJXaHkgU291dGggRmxvcmlkYSBBdmVudWUmIzgyMTc7cyBSb2FkIERpZXQgUmVidWlsZCBXaWxsIFRha2UgWWVhcnMgTG9uZ2VyIFRoYW4gRXhwZWN0ZWQiLCJ0ZW1wbGF0ZSI6ImRvaXMiLCJmb250IjoiIiwiYmxvZ19pZCI6MTYzMDQwNjYxfQ.n1RpDtAxdt2abn-hk3DpFcQBb7pOSW3egv0malKNrPEMQ","type":"image\/png"}]},"_wpas_customize_per_network":false},"categories":[7591],"tags":[237,18198,18117,15264,2454,17183,18199,18200],"class_list":["post-85187","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-city-of-lakeland","tag-lakeland","tag-construction","tag-dixieland","tag-infrastructure","tag-road-diet","tag-south-florida-avenue","tag-traffic","tag-urban-planning"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/85187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=85187"}],"version-history":[{"count":1,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/85187\/revisions"}],"predecessor-version":[{"id":85189,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/85187\/revisions\/85189"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/85188"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=85187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=85187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=85187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}