{"id":87105,"date":"2026-11-05T18:51:39","date_gmt":"2026-11-05T23:51:39","guid":{"rendered":"https:\/\/lakelandgazette.info\/news\/?p=87105"},"modified":"2026-11-05T19:14:51","modified_gmt":"2026-11-06T00:14:51","slug":"new-auburndale-data-center-site-targets-40-mw-at-recker-highway","status":"publish","type":"post","link":"https:\/\/lakelandgazette.info\/news\/2026\/11\/05\/new-auburndale-data-center-site-targets-40-mw-at-recker-highway\/","title":{"rendered":"New Auburndale Data Center Site Targets 40 MW at Recker Highway"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Hillwood Development Company filed an application for a building permit for a planned data center in two existing buildings on 75 acres in Auburndale<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A widespread initiative is converting an <em>existing warehouse<\/em> into a data center directly in Auburndale.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Instead, data center and high-intensity industrial interest in and around Auburndale and Polk County centers around a few key energy-dense locations:<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img data-dominant-color=\"ece9df\" data-has-transparency=\"false\" style=\"--dominant-color: #ece9df;\" loading=\"lazy\" decoding=\"async\" width=\"430\" height=\"292\" sizes=\"auto, (max-width: 430px) 100vw, 430px\" src=\"https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2026\/11\/Screenshot-1-3.webp\" alt=\"\" class=\"wp-image-87107 not-transparent\" srcset=\"https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2026\/11\/Screenshot-1-3.webp 430w, https:\/\/lakelandgazette.info\/news\/wp-content\/uploads\/2026\/11\/Screenshot-1-3-300x204.webp 300w\" \/><\/figure>\n<\/div>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>324 Recker Highway (Auburndale):<\/strong> This 13-acre industrial development site is marketed specifically as a <strong>40 MW Powered Data Center \/ Industrial Site<\/strong>. Rather than converting an old warehouse building, it is positioned as a ready-to-build footprint located directly fence-to-fence with the 540 MW Osprey Energy Center and its dual-feed switching station, making it a prime grid-dense node for an AI or mid-size data center.<\/li>\n\n\n\n<li><strong>Broader Polk County Activity:<\/strong> If you are tracking massive regional data center proposals, the biggest headlines in Polk County involve a completely greenfield project further south\u2014the approved $2.6 billion, 4.4 million-square-foot hyperscale data center campus spanning over 1,000 acres in <strong>Fort Meade<\/strong>.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Industrial site listings in Auburndale reflect active marketing of a <strong>13-acre site at 324 Recker Highway<\/strong> specifically as a <strong>40 MW Powered Data Center \/ Industrial Site<\/strong>.<sup><\/sup><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Key Site Specifications &amp; Details<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Location:<\/strong> 324 Recker Highway, Auburndale, FL<\/li>\n\n\n\n<li><strong>Power Node:<\/strong> The property sits directly adjacent (fence-to-fence) to the <strong>540 MW Osprey Energy Center<\/strong> and its 230 kV substation, eliminating long-distance power interconnect hurdles.<\/li>\n\n\n\n<li><strong>Capacity Timeline:<\/strong> Marketing materials cite a preliminary utility service assessment for <strong>10 MW by late 2028<\/strong> and full expansion up to <strong>40 MW by late 2029<\/strong>.<\/li>\n\n\n\n<li><strong>Intended Use:<\/strong> High-density AI compute \/ High-Performance Computing (HPC), advanced industrial manufacturing, or utility-scale energy\/battery storage.<\/li>\n<\/ul>\n\n\n\n<pre class=\"wp-block-preformatted\"> <code> +-------------------------------------------------------------+\n  |              324 Recker Highway (13 Acres)                  |\n  |         Target: 40 MW Mid-Size AI \/ HPC Data Center         |\n  +-------------------------------------------------------------+\n                               |\n       Direct Adjacency &amp; Redundant 230 kV Interconnect\n                               |\n  +-------------------------------------------------------------+\n  |    Osprey Energy Center (540 MW) &amp; Substation Node          |\n  +-------------------------------------------------------------+\n<\/code><\/pre>\n\n\n\n<h3 class=\"wp-block-heading\">Regional Context &amp; Surrounding Proposals<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Data center demand along the I-4 corridor between Tampa and Orlando is driving several nearby proposals across Polk County:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Lakeland (&#8220;Project Swan&#8221;):<\/strong> A proposed 600,000-square-foot hyperscale data center on ~60 acres off Old Tampa Highway. In response to power and water concerns, Lakeland city leaders introduced temporary moratoriums to establish long-term regulations for heavy utility users.<\/li>\n\n\n\n<li><strong>Fort Meade:<\/strong> Final site approvals were granted for a large-scale, $2.6B, 4.4 million-square-foot hyperscale campus across 1,100+ acres.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Hillwood Development Company filed an application for a building permit for a planned data center in two existing buildings on 75 acres in Auburndale A widespread initiative is converting an&hellip; <\/p>\n","protected":false},"author":2,"featured_media":87107,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"wpai_generated_summary":"","footnotes":"","jetpack_publicize_message":"{title}\n\n{excerpt}\n\n{url}","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"dois","default_image_id":71799,"font":"","enabled":true,"token":"eyJpbWciOiJodHRwczpcL1wvbGFrZWxhbmRnYXpldHRlLmluZm9cL25ld3NcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjZcLzExXC9TY3JlZW5zaG90LTEtMy53ZWJwIiwidHh0IjoiTmV3IEF1YnVybmRhbGUgRGF0YSBDZW50ZXIgU2l0ZSBUYXJnZXRzIDQwIE1XIGF0IFJlY2tlciBIaWdod2F5IiwidGVtcGxhdGUiOiJkb2lzIiwiZm9udCI6IiIsImJsb2dfaWQiOjE2MzA0MDY2MX0.7nFWPBGXxjdOMriElXPC5HKH40YMwlUQQSVj47pvMMsMQ"},"version":2,"media_source":"sig","attached_media":[{"id":0,"url":"https:\/\/jetpack.com\/redirect\/?source=sigenerate&query=t%3DeyJpbWciOiJodHRwczpcL1wvbGFrZWxhbmRnYXpldHRlLmluZm9cL25ld3NcL3dwLWNvbnRlbnRcL3VwbG9hZHNcLzIwMjZcLzExXC9TY3JlZW5zaG90LTEtMy53ZWJwIiwidHh0IjoiTmV3IEF1YnVybmRhbGUgRGF0YSBDZW50ZXIgU2l0ZSBUYXJnZXRzIDQwIE1XIGF0IFJlY2tlciBIaWdod2F5IiwidGVtcGxhdGUiOiJkb2lzIiwiZm9udCI6IiIsImJsb2dfaWQiOjE2MzA0MDY2MX0.7nFWPBGXxjdOMriElXPC5HKH40YMwlUQQSVj47pvMMsMQ","type":"image\/jpeg"}]},"_wpas_customize_per_network":false},"categories":[12,14],"tags":[18995,16445,16547,18944,16598,18994,18993],"class_list":["post-87105","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-local","category-news","tag-ai-compute","tag-auburndale","tag-data-center","tag-energy-infrastructure","tag-industrial-real-estate","tag-osprey-energy-center","tag-recker-highway"],"jetpack_publicize_connections":[],"_links":{"self":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/87105","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/comments?post=87105"}],"version-history":[{"count":2,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/87105\/revisions"}],"predecessor-version":[{"id":87114,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/posts\/87105\/revisions\/87114"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media\/87107"}],"wp:attachment":[{"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/media?parent=87105"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/categories?post=87105"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lakelandgazette.info\/news\/wp-json\/wp\/v2\/tags?post=87105"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}